![]() ![]() IX will return in spring of 2019, to backfill the structure and bring new sanitary and waterline utility services up to the building. IX’s scope of work for 2018 includes removal of existing buried building foundations, over 50,000 square feet of sheet pile installation, 150 tie-back anchors drilled under City of Cleveland roadways, 40,000 cubic yards of excavation up to 28 feet deep, temporary dewatering for building construction, and grading for the mat foundations. IX was awarded the excavation and utility bid package in late 2017, and immediately our engineering and project management teams sprung to action designing the temporary earth retention system that will allow for deep excavation of the building’s foundations, while protecting adjacent roadways and buildings on the one-acre site. Enveloped in glass, Playhouse Square District officials state that the name of the tower was chosen to reflect the energy surrounding Playhouse Square, the important role light plays in theater, as well as pay tribute to the GE Chandelier, the world’s largest permanent outdoor chandelier, that graces the intersection of Euclid Ave. The total project cost is estimated at $135 million. The Lumen will also contain 22,000 square feet of resident amenities, including a courtyard terrace with grill area and fireside lounge, electric car charging and car wash stations, a pet spa, bike storageĪnd repair station, concierge services, business and fitness centers, and a heated lap pool. The tower will host 318 luxury apartments and a garage with over 550 parking spaces. Rising to almost 400 feet tall, The Lumen will tower high above all other buildings in the Playhouse Square District. 17th Street, and will consist of a 34-story tower, housing luxury apartments, and a new parking garage. The building is being constructed on a one-acre site at the corner of Euclid Ave. As the largest residential project in downtown Cleveland in over 40 years, IX is honored to be a team member on this history-making development in the heart of the largest theater district outside of Broadway. (IX) is excited to partner with the Gilbane Building Company on the construction of The Lumen at Playhouse Square. The system can trigger a signal on encrypted software that controls the meters at customers home.Independence Excavating, Inc. This tool will allow CPP to respond quickly to residential customer requests by activating and deactivating meters remotely from a staff member’s desktop. To further improve the service offered to its customers, CPP is currently conducting a pilot program to evaluate a Remote Disconnection System that will ultimately serve all of our residential customers. The result: greater accuracy of the metering equipment and meter reads, reducing the number of re-reads and investigation orders. The system then calculates a customer’s usage from the previous meter reading. Meter reader personnel are able to drive by a premise, detect the radio signal coming from the customer premise on a mobile laptop data collector, capture a customer’s electric usage, then relay the information into the main Customer Information System (CIS). The new digital meters contain an electronic receiving chip, which gives off radio signals that are picked up by telecommunications towers throughout the City. With this change, all meters are read remotely and the number of estimated reads has been significantly reduced. At this time 99.9% of the reads on our system are remote. In 2006, Cleveland Public Power replaced its existing meters with digital radiometers. Automated digital meters are efficient and time-saving. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |